Decorating is judged entirely on preparation. Two coats over a filled-and-sanded, primed, dust-free surface will outlast four coats over a wall that was given a quick rub down. The paint is rarely what fails.

We decorate as a trade in its own right, not as a tidy-up at the end of a build — full preparation, correct primers for the substrate, and a finish that stands up to being looked at closely in daylight.

What this includes

  • Full surface preparation — filling, sanding, caulking and stabilising
  • Correct primers and undercoats for each substrate
  • Interior walls, ceilings and woodwork
  • Period joinery, cornicing, ceiling roses and panelling
  • Wallpaper hanging, including lining paper and feature walls
  • Spray finishing where the space allows
01

Preparation weighted properly

Filling, sanding, caulking and priming take the majority of the hours on any room we decorate.

02

The right primer

Bare plaster, previously oil-painted joinery, bare timber and stained ceilings all need different products. Using one primer for everything is why paint peels.

03

Clean working

Floors and furniture protected, dust extraction on sanders, and the room left clean at the end of every day.

Scope of works

What a full job covers.

This is the standard scope. Your written quotation itemises it against your property, so you can see exactly what is priced and what is not.
  • Full surface preparation — filling, sanding, caulking and stabilising
  • Correct primers and undercoats for each substrate
  • Interior walls, ceilings and woodwork
  • Period joinery, cornicing, ceiling roses and panelling
  • Wallpaper hanging, including lining paper and feature walls
  • Spray finishing where the space allows
  • Exterior masonry, render and pebbledash
  • Exterior timber — fascias, soffits, bargeboards, windows and doors
  • Metalwork, railings and gates
  • Minor repairs to plaster and joinery before decoration

Programme

How the job runs, stage by stage.

Indicative durations for a typical property. Your quotation carries the dates that apply to yours.
  1. 01

    Survey and colour

    2–4 days

    Site visit, substrate assessment, and a written quotation. Sample pots applied where colour is undecided.

  2. 02

    Preparation

    40–60% of the job

    Protection, stripping, filling, sanding, caulking and priming.

  3. 03

    Finishing coats

    30–40% of the job

    Undercoat and topcoats applied, with proper drying time between them.

  4. 04

    Inspection

    1 day

    Joint walk-round in daylight, touching in anything picked up before we leave.

What drives the price

Why two similar jobs quote differently.

We do not publish fixed prices, because a number without a survey behind it is a guess that somebody has to pay for later. What we can tell you is exactly which variables move the figure.

Bring these to the survey and the quotation will be far more accurate.

  • 01Condition of the existing surfaces, which drives the preparation time
  • 02Whether previously oil-painted woodwork needs full stripping
  • 03Ceiling height and whether scaffold towers or exterior scaffold are needed
  • 04Paint specification — trade emulsion against premium or specialist finishes
  • 05Wallpaper stripping and the state of the plaster underneath it
  • 06Number of colours and cut-in lines, which add time rather than material

Painting & Decorating — questions

What people ask us.

More general questions are answered on the FAQ page.
Do you supply the paint?
We can supply at trade rates, or you can buy your own if you have specific colours in mind. Either way we will tell you which finish and which primer the substrate needs before you order.
Can you decorate while we are living in the house?
Yes, and most of our decorating is done in occupied homes. We work room by room, protect everything, use dust-extracted sanders and low-odour products where possible, and clear down each evening.
What time of year is best for exterior work?
April to October in practice. Most exterior coatings need surface temperatures above about 8°C and dry conditions to cure properly, so we do not push exterior work into the middle of winter.