A bathroom is the smallest room in the house and the one most likely to cause expensive damage when it is built badly. Almost every bathroom failure we are called to repair comes down to the same three things: waterproofing that stopped short, a wet-room floor without enough fall, and movement under a tiled surface.
We build bathrooms from the substrate up. Floors are made rigid, wet areas are fully tanked, falls are set with a level rather than by eye, and tiling is set out so the cuts land where they should. It is slower, and it is the reason we are still not going back to fix them.
What this includes
- Strip-out and disposal of the existing suite
- Structural floor stiffening and levelling
- Soil, waste and supply pipework, re-routed as required
- Full tanking and waterproofing of wet areas
- Underfloor heating installation where specified
- Certified electrics — lighting, shaver points, extraction and IP-rated fittings
Fully tanked wet areas
Liquid membrane and taped joints across the full shower zone, not just a bead of silicone at the tray edge.
Rigid substrates
Floors stiffened and boarded so nothing moves under the tile. Movement is what cracks grout and lets water in.
Set out, not guessed
Tile layout is planned so full tiles land at the eye line and cuts land in the corners.
Scope of works
What a full job covers.
- Strip-out and disposal of the existing suite
- Structural floor stiffening and levelling
- Soil, waste and supply pipework, re-routed as required
- Full tanking and waterproofing of wet areas
- Underfloor heating installation where specified
- Certified electrics — lighting, shaver points, extraction and IP-rated fittings
- Wall and floor tiling, including large-format and natural stone
- Sanitaryware, brassware, shower screens and enclosures
- Ventilation to building regulations
- Plastering, decoration and final sealing
Programme
How the job runs, stage by stage.
- 01
Survey and specification
1 week
Measured survey, drainage and joist check, and a written quotation against your chosen suite.
- 02
Strip-out and first fix
3–5 days
Old suite removed, floor and walls prepared, pipework and electrics run.
- 03
Waterproofing and tiling
4–6 days
Tanking applied and cured, boards fixed, tiling set out and completed.
- 04
Second fix and finish
2–4 days
Suite and brassware installed, grouting and sealing, decoration, testing and handover.
What drives the price
Why two similar jobs quote differently.
We do not publish fixed prices, because a number without a survey behind it is a guess that somebody has to pay for later. What we can tell you is exactly which variables move the figure.
Bring these to the survey and the quotation will be far more accurate.
- 01Whether the layout stays the same or the soil pipe connection has to move
- 02Wet room against a standard tray, since a wet room needs a formed fall and full tanking
- 03Tile format and material — large-format porcelain and natural stone take longer to set out and cut
- 04Underfloor heating and the floor build-up it requires
- 05Condition of the existing joists and whether the floor needs strengthening
- 06Whether the property is a flat, where sound insulation and leak risk raise the specification
Bathroom Installations — questions
What people ask us.
How long does a bathroom take?
Can you install a wet room on an upper floor?
Do you supply the suite or do I?