A full renovation is really a scheduling problem wearing a building problem’s clothes. The trades are not individually difficult; getting them in the right order, with no dead weeks between them, is what separates a four-month job from an eight-month one.

We take on complete refurbishments of houses and flats — typically period properties being brought up to a modern standard, or probate and buy-to-let purchases that need everything doing at once. One programme, one team, one person you call.

What this includes

  • Strip-out, waste removal and structural repairs
  • Full rewire with new consumer unit and certification
  • Replumb, new boiler, heating system and radiators
  • Damp treatment, timber repairs and re-plastering throughout
  • Window and external door replacement or refurbishment
  • Kitchen and bathroom installation
01

A programme you can hold us to

You get a written stage-by-stage programme at the start, and we review progress against it with you every week.

02

Nothing hidden behind plaster

Electrics, plumbing, insulation and structural repairs are photographed at first fix so there is a record of what is behind every wall.

03

Period detail retained

Cornicing, ceiling roses, original floorboards and joinery are protected and reinstated rather than stripped out for speed.

Scope of works

What a full job covers.

This is the standard scope. Your written quotation itemises it against your property, so you can see exactly what is priced and what is not.
  • Strip-out, waste removal and structural repairs
  • Full rewire with new consumer unit and certification
  • Replumb, new boiler, heating system and radiators
  • Damp treatment, timber repairs and re-plastering throughout
  • Window and external door replacement or refurbishment
  • Kitchen and bathroom installation
  • New flooring, staircases, doors and architrave
  • Loft and wall insulation upgrades
  • Full redecoration inside and out
  • Certification pack — electrical, gas, and building control where applicable

Programme

How the job runs, stage by stage.

Indicative durations for a typical property. Your quotation carries the dates that apply to yours.
  1. 01

    Survey and scope

    2–3 weeks

    Room-by-room survey, condition report, priced schedule of works and an agreed programme before anything starts.

  2. 02

    Strip-out and structure

    2–4 weeks

    Removals, structural alterations, damp and timber works, and any layout changes.

  3. 03

    First fix

    3–5 weeks

    Rewire, replumb, heating, insulation, new windows, and plastering.

  4. 04

    Second fix and finishing

    4–8 weeks

    Kitchen, bathrooms, joinery, flooring, decoration, certification and handover.

What drives the price

Why two similar jobs quote differently.

We do not publish fixed prices, because a number without a survey behind it is a guess that somebody has to pay for later. What we can tell you is exactly which variables move the figure.

Bring these to the survey and the quotation will be far more accurate.

  • 01Whether the property is occupied during works, which affects sequencing and cost
  • 02Condition of the existing electrics, plumbing and roof — a rewire is a very different job from a partial upgrade
  • 03Structural alterations such as removing chimney breasts or forming open-plan spaces
  • 04Damp, rot or subsidence found during strip-out
  • 05Specification of kitchen, bathrooms and flooring, which is usually the largest single variable
  • 06Listed status or conservation area restrictions on windows and external work

Full House Renovations — questions

What people ask us.

More general questions are answered on the FAQ page.
Should I move out during a full renovation?
For a whole-house refurbishment involving a rewire and replaster, yes — it is faster, cheaper and safer. For phased work where we take a floor at a time, staying is workable. We will give you an honest view based on the scope rather than what is convenient for us.
How do payments work?
Payment is by bank transfer in stages against completed work, set out in the written quotation. There is a deposit to secure the start date and order materials, then stage payments as each phase completes, with a final balance on handover.
What happens if you find something unexpected?
Older properties nearly always hide something. When we find it we stop, photograph it, price the remedial work as a written variation, and you decide before we proceed. Nothing gets added to your bill without your agreement in writing.
Do you work on flats and leasehold properties?
Yes. Leasehold work usually needs freeholder consent and often a licence to alter, particularly for anything structural or for changes to flooring build-up. We will tell you what consents are needed before work starts.