An extension is the single largest change most people make to a house, and the one where the quality of the build is hardest to see once the plaster is on. We work the other way round: the parts you will never look at again — the footings, the steel, the damp-proofing, the insulation line — are the parts we take longest over.

We handle rear extensions, side returns, wrap-arounds and double-storey work on Victorian and Edwardian terraces, 1930s semis and post-war housing across South London. Because the same four people carry the job from excavation to final coat, nothing is handed between trades who have never spoken to each other.

What this includes

  • Site set-out, excavation and disposal
  • Concrete footings to building-control depth
  • Brick and blockwork, cavity insulation and damp-proof course
  • Steel beams and padstones to structural engineer’s specification
  • Flat or pitched roof structure, insulation, and single-ply or felt covering
  • Rainwater goods, flashings and weather sealing
01

Structure first

Foundations, steelwork and openings are set out against your engineer’s calculations and signed off by building control at every stage before anything is covered up.

02

One team throughout

Groundworks, brickwork, carpentry and finishing are carried out by the same four people. No sub-contract chains, no gaps in the programme.

03

A house you can live in

Where the layout allows we keep the existing kitchen usable and seal the works behind dust screens, so you are not moving out for three months.

Scope of works

What a full job covers.

This is the standard scope. Your written quotation itemises it against your property, so you can see exactly what is priced and what is not.
  • Site set-out, excavation and disposal
  • Concrete footings to building-control depth
  • Brick and blockwork, cavity insulation and damp-proof course
  • Steel beams and padstones to structural engineer’s specification
  • Flat or pitched roof structure, insulation, and single-ply or felt covering
  • Rainwater goods, flashings and weather sealing
  • Bi-fold, sliding or French door openings and lintels
  • First-fix and second-fix electrics and plumbing
  • Plasterboard, skim, screed or joisted floor build-up
  • Decoration, skirting, architrave and making good throughout

Programme

How the job runs, stage by stage.

Indicative durations for a typical property. Your quotation carries the dates that apply to yours.
  1. 01

    Survey and quotation

    1–2 weeks

    Site visit, measured check against your drawings, and a written quotation broken into stages so you can see exactly what each part costs.

  2. 02

    Groundworks and structure

    3–5 weeks

    Excavation, footings, oversite, damp-proofing, brickwork to plate height and steel installation.

  3. 03

    Weathertight shell

    2–3 weeks

    Roof structure, covering, windows and doors installed. The building is closed in and dry.

  4. 04

    First fix and finishes

    3–6 weeks

    Services, insulation, plasterboard and skim, flooring, joinery, decoration and final building-control sign-off.

What drives the price

Why two similar jobs quote differently.

We do not publish fixed prices, because a number without a survey behind it is a guess that somebody has to pay for later. What we can tell you is exactly which variables move the figure.

Bring these to the survey and the quotation will be far more accurate.

  • 01Footing depth — nearby trees, made ground or shallow drainage can add a metre or more of excavation
  • 02Whether drains need diverting or a build-over agreement is required
  • 03Span of the opening into the existing house, which sets the size and cost of the steel
  • 04Glazing specification — standard French doors against a wide aluminium bi-fold or slim-frame slider
  • 05Roof type: flat single-ply, pitched and tiled, or a lantern or roof-light run
  • 06Level of finish through the new space, particularly kitchens, flooring and joinery

House Extensions — questions

What people ask us.

More general questions are answered on the FAQ page.
Do I need planning permission for a rear extension?
Many single-storey rear extensions fall under permitted development, but the limits depend on your property type, whether it is in a conservation area, and whether previous extensions have used up the allowance. We will tell you honestly at the survey which route applies, and we work to either a planning approval or a lawful development certificate.
Who arranges the structural engineer and building control?
You can appoint your own, or we can recommend engineers and approved inspectors we work with regularly. Either way we book the inspections and are on site for them, so nothing is covered up before it has been seen.
What about the party wall with my neighbour?
If you are excavating within three metres of a neighbouring structure or building off a shared wall, a party wall notice is normally required. We will flag it at survey stage so there is time to serve notice — it is one of the most common causes of a delayed start.
How much disruption should I expect?
The noisy phase is groundworks and the opening-up, which is usually two to three days of genuine disruption. The rest is manageable. We sheet and screen the working area, keep a single access route, and clear the site at the end of every day.